Buyer guide · 7 steps
An audit tells you whether the factory can make the product. An inspection tells you whether it did. Buyers who skip the second to save $300 are the ones who call us after the container lands.

A factory audit in China is an on-site review of business license, production capacity, quality system and working conditions, done before the first order; a pre-shipment inspection is a random sample of the packed finished goods against the approved sample and the purchase order, done when production is at least 80 percent complete and before the balance is paid. Both produce a photographed report. XueQiu Pets includes the inspection in its sourcing fee and quotes audits per factory.
Step by step
The business license names the legal entity, its registered capital, its scope and its address. If the name on the license is not the name on the 1688 or Alibaba listing, you are dealing with a different company than you think. Photograph the license on the wall.
Count the lines and the people; compare with the staff number claimed. Look for the product you are buying in production, not just in the showroom. Ask to see the incoming material store and the finished goods warehouse. A factory that makes your product has your raw material on the shelf.
Incoming inspection records, in-process checks, and the last three customer complaints. A factory with a working quality system shows the folder; one without it shows a certificate.
Too early and the sample is not representative; too late and there is no time to fix anything before the ship date. Book it when the factory confirms 80 percent packed, and schedule it so there is a week before the container.
ANSI/ASQ Z1.4 General Inspection Level II, AQL 2.5 for major defects and 4.0 for minor, is the retail standard. For a 2,000-piece order that means 125 pieces pulled at random from different cartons, with a maximum of 7 majors to pass. The inspector should pull the cartons, not the factory.
Every check is a comparison: material, color, dimensions, weight, function, labeling and carton marks against the approved sample and the PO. Function tests are product-specific: a fountain runs for an hour, a harness buckle is cycled, a cage is assembled from the kit.
The balance is paid against a passed report, not against a ship date. A failed report means rework and re-inspection at the factory's cost if the defect is theirs. Put this in the PO before production starts, not after the report.
Questions
Apply it
Five product groups, twelve partner lines, one person who shortlists the factory and inspects what leaves it.
Sourcing guideFive product groups, ten partner lines, and the fountain line we already run quality control on.
Sourcing guideCages and hutches, bottles and feeders, bedding and chews.
Sourcing guideTwo product groups, both electrical: filters and pumps from the Zhongshan appliance cluster, heating and lighting from Shenzhen and Huizhou electric factories.
Sourcing guideOne product group, one cluster: welded wire cages, stands and feeders from the Linyi and Hebei metal-working towns that make most of the bird cages sold in the US.
Sourcing guideThree product groups across three kinds of factory: metal-working for grooming tools, sewing for recovery wear, foam and gel for cooling and orthopedic mats.
Sourcing guideWho you work with
The person who shortlists your factory is the person who inspects what leaves it. No account manager between you and the line.
Send a short brief: product, target price, quantity. You get a written scope and the service fee within one working day.